Flagship assessmentAvailable for pilot

Automation Readiness Assessment

Is this facility ready to adopt, integrate, operate and scale automation for the use case you have in mind? We answer that across fourteen domains, from the evidence, and we tell you plainly what's missing.

What it looks at

Fourteen domains, tailored to your facility.

Your assessor tailors the questions to your facility type, use case, systems and the evidence you already have, so you aren't asked about what doesn't apply.

Scope

The use case, area and goals being assessed

Facility

Floors, space, physical constraints

Electrical

Power and charging

Network & wireless

Coverage, roaming, capacity

Operational process

Repeatability, variation, exceptions

Integration

WMS, MES, ERP and data sync

Robotics compatibility

Fit with the proposed use case

Safety, fire & regulatory

Identified for specialist review

Cybersecurity

IT/OT boundaries and remote access

Maintenance

Capability and support model

Workforce

Skills, training, ownership, change

Financial

The financial assumptions behind the business case.

Deployment

Readiness to stage and run a rollout

Material & product

Item data and material flow

Tinted domains are covered in depth on the Facility, Process and Workforce section pages.

How evidence is weighed

Not all evidence counts the same.

Every finding records what kind of evidence stands behind it. A questionnaire answer alone never verifies anything, but a disclosed critical problem is enough to stop the assessment.

Self-reported

A response from your team. Enough to stop, never enough to advance.

Document-supported

Backed by a drawing, survey, record or report, cited to the page.

Measured

A measurement taken at the facility, such as a survey or audit sample.

Specialist-verified

Determined by a qualified engineer or specialist working within their scope.

How results are expressed

Every assessment ends in exactly one outcome.

Three outcomes stop short of a readiness level, and they come with no headline score. They are often the most useful result: they tell you what to fix before spending on automation.

BLOCKED

A critical issue stops the assessment. It leads the report, whatever else scored well.

WITHHELD

There isn't enough evidence to decide. You receive the list of evidence needed to finish.

NOT INDICATED

Measured conditions show process, data or economics need work first. Automation isn't the next step yet.

L1

General automation readiness

L2

[L2 definition pending]

L3

[L3 definition pending]

L4

Ready for detailed engineering and procurement

[How the per-criterion finding states relate to outcome classes: pending]

Structural, electrical, fire and safety findings need a qualified specialist's determination. Until then they show as pending, and the result can't go above L3. No level is a sign-off to deploy.

Sample results

Four modeled facilities, four different answers.

These facilities are modeled, not clients. They show how the assessment behaves when the answer isn't the one you hoped for.

Modeled warehouse A

Modeled facility — not a client

L2 · AMR use case

Modeled warehouse A reached L2 for the AMR use case, with open items listed.

Modeled facility B

Modeled facility — not a client

Blocked

A safety deficiency disclosed by a respondent stops the run and leads the report.

Modeled facility C

Modeled facility — not a client

Withheld

The evidence was too weak to decide. The output is a list of what's needed.

Modeled facility D

Modeled facility — not a client

Not indicated

A measured 23% exception rate means the process needs stabilizing before robotics.

Full sample reports: in development.

What you receive

Findings you can check, and act on.

Readiness scorecard

Domain results, supported findings and explicit unknowns, with coverage shown. No headline score on a blocked or withheld run.

Evidence register

The trail from every finding to the document, response, measurement or observation behind it.

Gap and risk analysis

Deficiencies, dependencies, severity and consequences.

Executive report

The result and what it means, written for the people funding the decision.

RFP requirements pack

In development

Your needs, constraints and open items, ready to carry into your own RFP. Needs only; no products or suppliers named.

Report formats are being finalized with our first pilot clients.

How it runs

Assessor-led, from scoping to report.

  1. Scoping conversation

    The use case, the area and what you need to decide.

  2. Evidence request

    A specific list of the documents and measurements that matter for your facility.

  3. Review with your team

    An assessor works through the evidence and the questions with the people who know the site.

  4. Specialist items identified

    Structural, electrical, fire and safety questions are flagged for qualified specialists.

  5. Findings and report

    One outcome, every finding traceable, and a walkthrough with your team.

How client documents are stored and retained is being finalized before pilots begin.

Considering an AMR project?

We're taking a small number of pilot conversations. Tell us about the facility and the use case.

Schedule a discovery call