Included in the flagship
Facility & Infrastructure Readiness
Robots and automated systems make physical demands of a building. This section looks at whether the floor, the space, the power and the environment can meet them for your use case.
What it covers
- Floor condition and loading
- Space, aisles and travel paths
- Power supply and charging
- Environment: temperature, dust, lighting
- Fire protection
- Other physical constraints
Most findings here are for qualified specialists, such as structural, electrical and fire engineers, to determine. We identify them and show them as pending until a specialist has determined them. While any are pending, the overall result can't go above L3.
Part of the Automation Readiness Assessment
This section is delivered only inside the full assessment, alongside the rest of its fourteen domains. It isn't sold separately.
See the full assessmentA section shows a score only when the assessment reaches a readiness level. If the run is blocked or withheld, you see its findings, blockers and unknowns without a number.